Size and access
Larger floors cost less per square foot because setup is spread out. Tight access and obstacles slow work.
Slab condition
Coatings, glue, cracks, patches and stains add work. A clean, sound slab takes the least work to polish.
Number of steps and final grit
More steps and a higher final gloss take more time and diamonds.
Aggregate exposure
Deeper exposure requires more grinding.
Color and design
Dye, stain, saw cuts and logos add materials and labor.
Repairs and prep
Crack fills, joint repair and patching are separate line items.
Schedule
Night and weekend work and phased schedules can change price.
Protection and guard
Choice of guard and level of protection vary.
Location and travel
Distance and logistics matter on statewide projects.
Why two similar floors can cost different amounts
Two rooms of the same size can need very different work. One may be a clean, hard, flat slab that moves through the steps quickly. The other may have glue, deep scratches and patched areas that need hours of extra preparation first. The difference is almost always in the preparation, not the polishing.
How to get a useful estimate
Share the square footage, the type of space, the current surface, and any photos of cracks, stains or coatings. Tell us whether the building stays open, whether there are time limits and what finish you have in mind.
Ways to plan around a budget
Polishing only the visible areas, choosing a satin finish instead of a mirror, keeping the natural slab color, and phasing the work are common ways to match a project to a budget without cutting the important preparation steps.
The Cost Estimator tool
The Cost Estimator on this site produces a planning idea from your inputs. It is a ballpark only, and a site visit is what confirms a real number.
Quick answers
Is polishing cheaper than other floors?
It can be, especially over the long term, but the answer depends on the slab and the finish.
How do I get an accurate price?
A site visit and slab tests are the best basis for a quote.
Is a site visit needed for an estimate?
For a firm number, yes. A visit lets us test the slab and check the access, power and schedule.